The project has to follow very strict timescales in order to meet the Ready For Sevice (RFS) date of September 2009. In order to do this there are two key documents that track various parts of the project, the Permit Matrix and the Plan Of Work (POW). In addition to these two documents, there are smaller POWs that cover specific sections (such as the terrestrial fibre builds, construction works, surveying etc). The overview of the POW for the whole project is as follows:
|